Fabric Rolls and Idle Stock: What Buying Cloth Costs

Rolls of linen-look fabric in rust, sage, navy, mustard and cream standing on a wooden table, with one pale blue roll partly unrolled beside a yellow measuring tape and a small cut piece

The fabric sum on a costing sheet is tidy: metres a garment, times the price, times the order. But the mill does not sell metres a garment. It sells rolls, and the roll arrives before the cutting starts. Both of those cost something, and the cost lands hardest on the small order.

Two things the sheet leaves out

  • Rounding up to whole rolls. If the order needs 55 metres and rolls are 50, you buy two rolls. You pay for 100 and use 55.
  • Waiting. The cloth is paid for, and sits, until the order is cut. That is money tied up, the same arithmetic as in the payment terms article.

A worked example

These figures are made up to show the sum. They are not a benchmark and not a claim about any mill. The fabric need is from the fabric consumption article: 0.918 m a garment at ₹250 a metre, ₹229.50 a garment. The roll length, 50 m, is an assumption, and so is the interest rate, 12% a year.

Rounding up to rolls

  • 50 garments: 45.9 m needed. One roll, 50 m. Bought ₹12,500, which is ₹250.00 a garment, ₹20.50 more than the sheet said.
  • 60 garments: 55.1 m needed. Two rolls, 100 m. Bought ₹25,000, which is ₹416.67 a garment — ₹187.17, or 82%, more, because the fifty-first metre forced a whole second roll.
  • 200 garments: 183.6 m needed. Four rolls, 200 m. Bought ₹50,000, ₹250.00 a garment.
  • 1,000 garments: 918 m needed. Nineteen rolls, 950 m. Bought ₹237,500, ₹237.50 a garment, ₹8.00 more.

The sheet says ₹229.50 for all four. The bill says ₹237.50 to ₹416.67. The rounding is a few per cent on a large order and can be most of the fabric cost again on a small one, depending on where the order falls against a roll.

Round up before you quote Work out the rolls the order needs, not the metres, and divide the bill by the garments. The difference between the two is the part of the price nobody saw.

What happens to the leftover

On the 200-garment order, 16.4 m is left over: ₹4,100, 8.2% of the bill. On the 60-garment order, 44.9 m: ₹11,230. If the same fabric is needed again, that cloth is not wasted, it is stock. If it is not, it is cost. The honest question is whether there is a next order for that cloth that you can name; the trims article asks the same of labels.

  • Ask the mill for a cut length. Some will cut a part-roll, at a price. If the price for 55 m is less than the price for a second roll, it is worth it.
  • Combine orders in the same cloth. Two orders of 30 garments in one fabric use one roll; apart, they use two.
  • Move the order to a roll boundary, if the buyer has room. A few more garments may cost nothing in cloth: 50 m covers 54 garments, not 50.

What idle cloth costs

On top of the rounding, the cloth is paid for before it is used. For the 1,000-garment order, the bill is ₹237,500. If it arrives 30 days before cutting, the interest is 237,500 × 0.12 × 30 ÷ 365 = ₹2,342, or ₹2.34 a garment. For the 200-garment order, ₹493, or ₹2.47 a garment.

It is small beside the rounding, but it grows with the days. Cloth that sits for ninety days costs three times as much, and cloth that sits until the next season costs the interest and the risk that the next order never comes.

What the sums leave out

  • Made-up roll length, price and rate. 50 m, ₹250 and 12% are assumptions. Rolls differ by fabric and by mill. Use your own.
  • Shrinkage. The metres needed are for cut sizes, not finished ones. The shrinkage article shows how that can change the count.
  • Defects in the roll. A length of bad cloth is a length you cannot cut. It adds to the metres bought and comes off the metres usable.
  • Minimum quantities per colour. A mill's minimum can be larger than a roll. Check it before assuming a roll is the smallest purchase, and see the minimum order article.

Put the rolls you will really buy into the fabric consumption calculator's price, not the metres, and the costing sheet will carry the figure the bill does.

Was this guide useful?